Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Mar 01, 2022     Throttle quadrant - (3.1 hours)       Category: Controls
1. Connected the six-pin Molex connector for the throttle grip wiring.

2. Connected all three quadrant cables to their respective controls. After considerable work with a mirror, flashlight, and various needle-nose pliers, I managed to insert all three cotter pins into the clevis pins and get them bent a bit. I still have a bit of work ahead, trying to get the cotter pins fully bent.

3. Tightened all quadrant hardware and tested the throws of the controls.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.